A New Bridge on the Birch Trail
Volunteers replaced the rotten footbridge over the runoff in one Saturday.
From the desk · November 18, 2026
Volunteers replaced the rotten footbridge over the runoff in one Saturday.
From the desk · November 18, 2026
The little footbridge where the Birch Trail crosses the runoff ditch had been closed with orange tape since August, after a board gave way under a jogger. On Saturday, eleven volunteers replaced it in about six hours.
The lumber was donated by the hardware store on Route 9. The design, if that is the word, came from a retired carpenter on Aspen Way who drew it on the back of an envelope and then stood beside it all day to make sure it was built the way he drew it.
The new bridge is wider than the old one, wide enough for a stroller, and has a rail on the side where the bank drops off. The parks department inspected it on Tuesday and took the tape down.
If you walk the trail this week, the old boards are stacked by the trailhead. Anyone who wants them for a garden bed is welcome to take them.